A Study on Sizing of Substation for PV With Optimized Operation of BESS
Recent development and cost down of PV(Photovoltaic) technology drive change of power system structure. The participation of PV generation is increasing, and the size of each PV farm is getting larger. In order to integrate large PV farms into the main grid, substation for interconnection needs to b...