A Study on Sizing of Substation for PV With Optimized Operation of BESS
Recent development and cost down of PV(Photovoltaic) technology drive change of power system structure. The participation of PV generation is increasing, and the size of each PV farm is getting larger. In order to integrate large PV farms into the main grid, substation for interconnection needs to b...
Main Authors: | Yeuntae Yoo, Gilsoo Jang, Seungmin Jung |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2020-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9272275/ |
Similar Items
-
Open-Access Model of a PV–BESS System: Quantifying Power and Energy Exchange for Peak-Shaving and Self Consumption Applications
by: Joel Alpízar-Castillo, et al.
Published: (2023-07-01) -
Development of PV hosting-capacity prediction method based on Markov Chain for high PV penetration with utility-scale battery storage on low-voltage grid
by: Wijaya Yudha Atmaja, et al.
Published: (2023-12-01) -
A customer-centric distributed data-driven stochastic coordination method for residential PV and BESS
by: Liu, Huichuan, et al.
Published: (2023) -
Case Studies for Supplying the Alternating Current Auxiliary Systems of Substations with a Voltage Equal to or Higher than 230 kV
by: Mariana de Morais Cavalcanti, et al.
Published: (2023-07-01) -
The Impact of Aging-Preventive Algorithms on BESS Sizing under AGC Performance Standards
by: Cristobal Morales, et al.
Published: (2021-11-01)