TIME DEVIATION ANALYSIS OF THE BASELINE PLAN ON THE CASE STUDY: IMPLEMENTATION OF REINFORCED CONCRETE WORKS ON A SCHOOL CONSTRUCTION PROJECT IN THE REPUBLIC OF CROATIA
In the paper, an analysis of the time aspect of the baseline plan for the execution of reinforced concrete works was carried out on a case study. The case study covers the construction of a public school in the Republic of Croatia, which was completed in 2023. By analyzing the baseline plan, it was...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Mostar, Faculty of Civil Engineering, Architecture and Geodesy
2023-12-01
|
Series: | e-Zbornik. Elektronički Zbornik Radova Građevinskog Fakulteta |
Subjects: | |
Online Access: | https://e-zbornik.gf.sum.ba/en/archive-en/e-zbornik-no-26/no-26-paper-6 |