Study on path planning and tracking of the underground mining road-header
According to the working characteristics of the underground road-header, path planning and movements scheduling for path correction of the road-header is formulated.The position and orientation errors of the road-header during working are also presented based on its kinematic model.Taking the workin...
Main Authors: | Qu Yuanyuan, Song Linke, Ji Xiaodong, Wu Miao |
---|---|
Format: | Article |
Language: | English |
Published: |
Emergency Management Press
2020-04-01
|
Series: | 矿业科学学报 |
Subjects: | |
Online Access: | http://kykxxb.cumtb.edu.cn/article/id/280 |
Similar Items
-
Path tracking of mining boom road-header using SVD-Unscented Kalman Filtering
by: Ji Xiaodong, et al.
Published: (2022-06-01) -
Path Tracking Control of an Articulated Road Roller With Sideslip Compensation
by: Meng Yang, et al.
Published: (2020-01-01) -
Path Tracking of Underground Mining Boom Roadheader Combining BP Neural Network and State Estimation
by: Yuanyuan Qu, et al.
Published: (2022-05-01) -
Path Tracking Control of a Tractor on a Sloping Road with Steering Compensation
by: Jieyong Ou, et al.
Published: (2023-11-01) -
Path-Tracking Ability of the ASV on Different Adhesion Coefficient Roads Based on Slide Mode Control
by: Shengzhi Zhong, et al.
Published: (2023-12-01)