Internet of Things for Survey of Renewable Energy Potential (SREP) as the Basis for Hybrid Power Plant Development

In the future, microhybrid power plant for the household scale will be something that the people want. The obstacle that is faced by the developers in micro hybrid plant development is the lack of a preliminary study. If a preliminary study is not possible, at least the developer should conduct a po...

Full description

Bibliographic Details
Main Authors: Muslikhin, Marpanaji Eko, IzzuddinMahali Muh.
Format: Article
Language:English
Published: EDP Sciences 2016-01-01
Series:MATEC Web of Conferences
Subjects:
Online Access:http://dx.doi.org/10.1051/matecconf/20165406003