Study on the setting time and real-stope continuous filling strategy for metal mine backfill via a self-made simple iron cylinder
The interval time between successive filling processes in a stope is a critical parameter for metal mines. It is imperative to accurately determine this interval time. The relationship curves between curing time and heavy hammer settlement height under various types of cementing materials and slurry...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2024-06-01
|
Series: | Results in Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2590123024003827 |