Permanent Shaft Repair Technology for Damaged Shield Segments in Operating Metro Tunnels
[Objective] During the drilling construction of ground surface dewatering shaft in a metro operational interval shield tunnel, the tunnel segments were damaged due to being pierced, resulting in sudden water hazards to interrupt metro service. In light of this, it is necessary to study permanent rep...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Urban Mass Transit Magazine Press
2024-01-01
|
Series: | Chengshi guidao jiaotong yanjiu |
Subjects: | |
Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.01.034.html |