Optimized process intensification through dynamic performance simulation and evaluation of treatment alternatives for a wastewater treatment plant in Toronto
In this study, a comprehensive plant-wide model of the North Toronto Treatment Plant (NTTP) was developed, focusing on improving operational efficiency and capacity utilization. NTTP, with a rated capacity of 45 MLD, is currently operating at about 18 MLD with treatment processes including physical...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2024-06-01
|
Series: | Results in Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2590123024003013 |