An on-load test method prior to substation operation based on synchronous current and voltage output

Given the limitations of the original primary current and voltage carrying tests prior to substation operation, the paper expounds the principle of high current and high voltage decoupling and synchronous output control and proposes an on-load test method prior to substation operation based on high...