A Hybrid Cuckoo Algorithm for Lot Scheduling Problem Using Extended Basic Period and Power of Two Policy
This paper addresses ELSP (Economic Lot Scheduling Problem) using EBPA (Extended Basic Period Approach) model with PoT (Power of Two) policy. The objective is to solve the ELSP using HCA (Hybrid Cuckoo Search Algorithm). The proposed approach improves the solution (i.e. minimizes the total cost whic...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Mehran University of Engineering and Technology
2016-04-01
|
Series: | Mehran University Research Journal of Engineering and Technology |
Subjects: | |
Online Access: | http://publications.muet.edu.pk/research_papers/pdf/pdf1279.pdf |