Simulation and optimization of scrap wagon dismantling system based on Plant Simulation
Abstract Based on the existing plant layout and process flow, a simulation analysis was conducted using the Plant Simulation platform with the utilization efficiency of each station and production capacity of the dismantling system as indicators. A problem with long-term suspension in the disassembl...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
SpringerOpen
2023-04-01
|
Series: | Visual Computing for Industry, Biomedicine, and Art |
Subjects: | |
Online Access: | https://doi.org/10.1186/s42492-023-00134-7 |