Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case study
This paper presents a methodology to systematically assess and manage the risks associated with tunnel construction. The methodology consists of combining a geologic prediction model that allows one to predict geology ahead of the tunnel construction, with a construction strategy decision model that...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Language: | en_US |
Published: |
Elsevier
2016
|
Online Access: | http://hdl.handle.net/1721.1/101601 https://orcid.org/0000-0003-4074-4736 |