Electric generation production scheduling using a quasi-optimal sequential technique
Prepared in association with Electric Power Systems Engineering Laboratory and Dept. of Civil Engineering, M.I.T
Main Author: | |
---|---|
Format: | Technical Report |
Language: | en_US |
Published: |
MIT Energy Lab
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/27234 |