A Generic Mechanism for Repairing Job Shop Schedules
Reactive repair of a disrupted schedule is a better alternative to total rescheduling, as the latter is a time consuming process and also results in shop floor nervousness. The schedule repair heuristics reported in the literature generally address only machine breakdown. This paper presents a modif...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | en_US |
Published: |
2003
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/3744 |