The design and implementation of a demonstration supplementary control system

The overall goal of the Chestnut Ridge Supplemental Control System (SCS) demonstration project was to demonstrate how an existing monitoring network, existing air quality models, and existing meteorological forecasting methods could be combined with a new control strategy to integrate SCS into elect...

Full description

Bibliographic Details
Main Author: Ruane, Michael Frederick
Other Authors: U.S. Atomic Energy Commission.
Published: Cambridge, Mass. : Massachusetts Institute of Technology, Energy Laboratory, 1980 2011
Subjects:
Online Access:http://hdl.handle.net/1721.1/60501