A_building
Built using a p2 with LRF alone. The main corridor is 123m long. This main will be expended later, and re-updated as we test more and more for the Centibots project.
第一著者: | |
---|---|
出版事項: |
2011
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/1721.1/62276 |