A_building
Built using a p2 with LRF alone. The main corridor is 123m long. This main will be expended later, and re-updated as we test more and more for the Centibots project.
Main Author: | |
---|---|
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/62276 |
Summary: | Built using a p2 with LRF alone. The main corridor is 123m long. This main will be expended later, and re-updated as we test more and more for the Centibots project. |
---|