A_building
Built using a p2 with LRF alone. The main corridor is 123m long. This main will be expended later, and re-updated as we test more and more for the Centibots project.
Main Author: | Vincent, Regis |
---|---|
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/62276 |
Similar Items
-
kwing_wld
by: Vincent, Regis
Published: (2011) -
albert-b-laser
by: Stachniss, Cyrill
Published: (2011) -
ap_hill_07b
by: Howard, Andrew
Published: (2011) -
utk-claxton
by: Bailey, Michael
Published: (2011) -
ut_austin_aces3
by: Beeson, Patrick
Published: (2011)