An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
Hovedforfatter: | |
---|---|
Andre forfattere: | |
Format: | Thesis |
Sprog: | eng |
Udgivet: |
Massachusetts Institute of Technology
2011
|
Fag: | |
Online adgang: | http://hdl.handle.net/1721.1/62507 |