An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line

Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.

Bibliographic Details
Main Author: Wongso, Ricolas
Other Authors: Stephen C. Graves.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2011
Subjects:
Online Access:http://hdl.handle.net/1721.1/62507
_version_ 1811076793944244224
author Wongso, Ricolas
author2 Stephen C. Graves.
author_facet Stephen C. Graves.
Wongso, Ricolas
author_sort Wongso, Ricolas
collection MIT
description Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
first_indexed 2024-09-23T10:27:41Z
format Thesis
id mit-1721.1/62507
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T10:27:41Z
publishDate 2011
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/625072019-04-12T13:27:33Z An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line Application of VSM to reduce lead time and Work In Process in a make-to-order manufacturing line Wongso, Ricolas Stephen C. Graves. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010. Cataloged from PDF version of thesis. Includes bibliographical references (p. 57). Significant growth in the sales is expected in the coming years for the product family that is the focus of this research. In order to meet the takt time for the future demand, improvement on the current processes and expansion are needed. In this work, Value Stream Mapping was implemented to identify the bottleneck processes: fit up (oval), full welding, and pressure testing. Assembly cell concept, workload balancing and FIFO lanes were proposed countermeasures or improvements to address the capacity shortfall. A decrease of 27% in manufacturing lead time was projected if these improvements were made. In addition, the capacity analysis suggests that an expansion is required in full welding and heat treatment furnace. by Ricolas Wongso. M.Eng. 2011-04-25T16:10:34Z 2011-04-25T16:10:34Z 2010 2010 Thesis http://hdl.handle.net/1721.1/62507 712601681 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 67 p. application/pdf Massachusetts Institute of Technology
spellingShingle Mechanical Engineering.
Wongso, Ricolas
An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
title An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
title_full An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
title_fullStr An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
title_full_unstemmed An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
title_short An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
title_sort application of value stream mapping to reduce lead time and wip in a make to order manufacturing line
topic Mechanical Engineering.
url http://hdl.handle.net/1721.1/62507
work_keys_str_mv AT wongsoricolas anapplicationofvaluestreammappingtoreduceleadtimeandwipinamaketoordermanufacturingline
AT wongsoricolas applicationofvsmtoreduceleadtimeandworkinprocessinamaketoordermanufacturingline
AT wongsoricolas applicationofvaluestreammappingtoreduceleadtimeandwipinamaketoordermanufacturingline