An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/62507 |
_version_ | 1811076793944244224 |
---|---|
author | Wongso, Ricolas |
author2 | Stephen C. Graves. |
author_facet | Stephen C. Graves. Wongso, Ricolas |
author_sort | Wongso, Ricolas |
collection | MIT |
description | Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010. |
first_indexed | 2024-09-23T10:27:41Z |
format | Thesis |
id | mit-1721.1/62507 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T10:27:41Z |
publishDate | 2011 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/625072019-04-12T13:27:33Z An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line Application of VSM to reduce lead time and Work In Process in a make-to-order manufacturing line Wongso, Ricolas Stephen C. Graves. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010. Cataloged from PDF version of thesis. Includes bibliographical references (p. 57). Significant growth in the sales is expected in the coming years for the product family that is the focus of this research. In order to meet the takt time for the future demand, improvement on the current processes and expansion are needed. In this work, Value Stream Mapping was implemented to identify the bottleneck processes: fit up (oval), full welding, and pressure testing. Assembly cell concept, workload balancing and FIFO lanes were proposed countermeasures or improvements to address the capacity shortfall. A decrease of 27% in manufacturing lead time was projected if these improvements were made. In addition, the capacity analysis suggests that an expansion is required in full welding and heat treatment furnace. by Ricolas Wongso. M.Eng. 2011-04-25T16:10:34Z 2011-04-25T16:10:34Z 2010 2010 Thesis http://hdl.handle.net/1721.1/62507 712601681 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 67 p. application/pdf Massachusetts Institute of Technology |
spellingShingle | Mechanical Engineering. Wongso, Ricolas An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line |
title | An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line |
title_full | An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line |
title_fullStr | An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line |
title_full_unstemmed | An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line |
title_short | An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line |
title_sort | application of value stream mapping to reduce lead time and wip in a make to order manufacturing line |
topic | Mechanical Engineering. |
url | http://hdl.handle.net/1721.1/62507 |
work_keys_str_mv | AT wongsoricolas anapplicationofvaluestreammappingtoreduceleadtimeandwipinamaketoordermanufacturingline AT wongsoricolas applicationofvsmtoreduceleadtimeandworkinprocessinamaketoordermanufacturingline AT wongsoricolas applicationofvaluestreammappingtoreduceleadtimeandwipinamaketoordermanufacturingline |