Plant Design and Cost Assessment of Forced Circulation Lead-Bismuth Cooled Reactor with Conventional Power Conversion Cycles
Cost of electricity is the key factor that determines competitiveness of a power plant. Thus the proper selection, design and optimization of the electric power generating cycle is of main importance. This report makes an assessment of power generation of the Actinide Burner Reactor (MABR). The reac...
Main Authors: | , , , |
---|---|
Other Authors: | |
Format: | Technical Report |
Published: |
Massachusetts Institute of Technology. Center for Advanced Nuclear Energy Systems. Advanced Nuclear Power Program
2011
|
Online Access: | http://hdl.handle.net/1721.1/67670 |