Plant Design and Cost Assessment of Forced Circulation Lead-Bismuth Cooled Reactor with Conventional Power Conversion Cycles
Cost of electricity is the key factor that determines competitiveness of a power plant. Thus the proper selection, design and optimization of the electric power generating cycle is of main importance. This report makes an assessment of power generation of the Actinide Burner Reactor (MABR). The reac...
Main Authors: | Dostal, Vaclav, Hejzlar, Pavel, Todreas, Neil E., Kazimi, Mujid S. |
---|---|
Other Authors: | Advanced Nuclear Power Technology Program (Massachusetts Institute of Technology) |
Format: | Technical Report |
Published: |
Massachusetts Institute of Technology. Center for Advanced Nuclear Energy Systems. Advanced Nuclear Power Program
2011
|
Online Access: | http://hdl.handle.net/1721.1/67670 |
Similar Items
-
Conceptual Reactor Physics Design of a Lead-Bismuth-Cooled Critical Actinide Burner
by: Hejzlar, Pavel, et al.
Published: (2011) -
Plant Design and Cost Estimation of a Natural Circulation Lead-Bismuth Reactor with Steam Power Conversion Cycle
by: Kim, D., et al.
Published: (2011) -
Plant Design and Cost Estimation of a Natural Circulation Lead-Bismuth Reactor with Helium Power Conversion Cycle
by: Kim, D., et al.
Published: (2011) -
Conceptual Design of a Lead-Bismuth Cooled Fast Reactor with In-Vessel Direct-Contact Steam Generation
by: Buongiorno, J., et al.
Published: (2011) -
A Super Critical Carbon Dioxide Cycle for Next Generation Nuclear Reactors
by: Dostal, Vaclav, et al.
Published: (2011)