Evaluating foreign Build-Operate-Transfer (BOT) projects using the adjusted net present value (ANPV) method : Thailand's Second Stage Expressway (SES)
Thesis (M.C.P. and S.M.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, September 1999.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/8960 |