Evaluating foreign Build-Operate-Transfer (BOT) projects using the adjusted net present value (ANPV) method : Thailand's Second Stage Expressway (SES)

Thesis (M.C.P. and S.M.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, September 1999.

Bibliographic Details
Main Author: Tom, Jonathan D. (Jonathan David), 1966-
Other Authors: Paul Smoke.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2005
Subjects:
Online Access:http://hdl.handle.net/1721.1/8960