Operator Performance in Long Duration Control Operations: Switching from Low to High Task Load
Long duration, low task load environments are typical for nuclear power plant control rooms, where operators, after hours of operating under a low task load situation, may have to shift to a high task load situation. The effects of time-on-task and boredom due to low task load will be an important c...
Հիմնական հեղինակներ: | , , |
---|---|
Ձևաչափ: | Presentation |
Հրապարակվել է: |
HFES
2014
|
Խորագրեր: | |
Առցանց հասանելիություն: | http://hdl.handle.net/1721.1/90362 |