Efficient scheduling to reduce setup times and increase utilization in a multiple-part manufacturing system

Thesis: M. Eng. in Manufacturing, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014.

Bibliographic Details
Main Author: Puszko, Gregory D
Other Authors: Stanley B. Gershwin.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2015
Subjects:
Online Access:http://hdl.handle.net/1721.1/93849