Efficient scheduling to reduce setup times and increase utilization in a multiple-part manufacturing system
Thesis: M. Eng. in Manufacturing, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014.
Main Author: | Puszko, Gregory D |
---|---|
Other Authors: | Stanley B. Gershwin. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/93849 |
Similar Items
-
Scheduling manufacturing system with sequence dependent setup and maintenance
by: Hendra Teja Wirawan
Published: (2015) -
Dynamic scheduling of manufacturing systems with setups and random disruptions
by: Tubilla Kuri, Fernando
Published: (2011) -
Multiple-part-type production scheduling for high volume manufacturing (time-based approach)
by: Xie, Zhiyu, M. Eng. Massachusetts Institute of Technology
Published: (2009) -
Unrelated parallel machine scheduling with setup times subject to job release and expired times
by: Chen, Changyu
Published: (2020) -
Magnetic sensor utilizing fabry pérot setup.
by: Teh, Ezekiel Zhi Wen.
Published: (2011)