A two-phase iterative mathematical programming-based heuristic for a flexible job shop scheduling problem with transportation

In a flexible job shop problem with transportation (FJSPT), a typical flexible manufacturing system comprises transporters that pick up and deliver jobs for processing at flexible job shops. This problem has grown in importance through the wide use of automated transporters in Industry 4.0. In this...

সম্পূর্ণ বিবরণ

গ্রন্থ-পঞ্জীর বিবরন
প্রধান লেখক: Lim, Che Han, Moon, Seung Ki
অন্যান্য লেখক: School of Mechanical and Aerospace Engineering
বিন্যাস: Journal Article
ভাষা:English
প্রকাশিত: 2023
বিষয়গুলি:
অনলাইন ব্যবহার করুন:https://hdl.handle.net/10356/169242