Analysis of abutment scour
Scouring is a major cause of failure of bridge foundations. It is important to determine the maximum depth of scour to estimate depth of burial of bridge footings to ensure structural safety. Five sets of long duration scouring experiments of up to 170.8 hours long were conducted to verify an eq...
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project (FYP) |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/52670 |