From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects
In this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build pr...
主要作者: | |
---|---|
其他作者: | |
格式: | Thesis |
出版: |
2008
|
主题: | |
在线阅读: | http://hdl.handle.net/10356/6689 |