Feasibility study of small hydroelectric system on terrain elevation differences in an urban catchment
In ensuring a fully functional and operational mini-hydropower facility, it is crucial to conduct a thorough hydrological study in the proposed geographical area. This serves to ensure that there are sufficient water resources available in the water catchment to allow for a consistent production of...
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project (FYP) |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/71321 |