Solving of the economic lot scheduling problem using a power of two based policy
In this project, we propose an algorithm that starts with the Common Cycle time solution which guarantees feasibility to the schedule generated and then improve upon this solution to minimize the cost of production. The power of two based heuristic policy is used to improve the Common Cycle Time sol...
मुख्य लेखक: | |
---|---|
अन्य लेखक: | |
स्वरूप: | Final Year Project (FYP) |
प्रकाशित: |
2008
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10356/8394 |