Yard Crane Scheduling to Minimize Total Weighted Vessel Loading Time in Container Terminals

One of the most important objectives for container terminals is to minimize the total weighted turnaround time for vessels. Minimizing total weighted vessel loading time directly helps minimize total weighted vessel turnaround time. In this paper we consider the yard crane (YC) scheduling problem in...

Full description

Bibliographic Details
Main Authors: Huang, Shell Ying, Li, Ya
Other Authors: School of Computer Science and Engineering
Format: Journal Article
Language:English
Published: 2017
Subjects:
Online Access:https://hdl.handle.net/10356/86084
http://hdl.handle.net/10220/44157