Yard Crane Scheduling to Minimize Total Weighted Vessel Loading Time in Container Terminals
One of the most important objectives for container terminals is to minimize the total weighted turnaround time for vessels. Minimizing total weighted vessel loading time directly helps minimize total weighted vessel turnaround time. In this paper we consider the yard crane (YC) scheduling problem in...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Journal Article |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/86084 http://hdl.handle.net/10220/44157 |