Yard Crane Scheduling to Minimize Total Weighted Vessel Loading Time in Container Terminals
One of the most important objectives for container terminals is to minimize the total weighted turnaround time for vessels. Minimizing total weighted vessel loading time directly helps minimize total weighted vessel turnaround time. In this paper we consider the yard crane (YC) scheduling problem in...
Main Authors: | Huang, Shell Ying, Li, Ya |
---|---|
Other Authors: | School of Computer Science and Engineering |
Format: | Journal Article |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/86084 http://hdl.handle.net/10220/44157 |
Similar Items
-
Investigating transportation system in container terminals and developing a yard crane scheduling model
by: Hassan Javanshir, et al.
Published: (2012-01-01) -
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
by: Hsien-Pin Hsu, et al.
Published: (2021-09-01) -
Integrated Scheduling of Automated Yard Cranes and Automated Guided Vehicles with Limited Buffer Capacity of Dual-Trolley Quay Cranes in Automated Container Terminals
by: Doaa Naeem, et al.
Published: (2022-12-01) -
An Agent-Based Solution Framework for Inter-Block Yard Crane Scheduling Problems
by: Omor Sharif, et al.
Published: (2012-06-01) -
A Multi-Stage Approach for External Trucks and Yard Cranes Scheduling with CO<sub>2</sub> Emissions Considerations in Container Terminals
by: Ahmed Talaat, et al.
Published: (2023-11-01)