Pilot tests on methods to form working platform on soft clay

Pilot tests on the usage of vacuum preloading combined with short prefabricated vertical drains (PVDs) to form a working platform for future soil improvement work were conducted at a land reclamation site in Tianjin, China. The short PVDs were connected using three methods – the conventional vacuum...

Full description

Bibliographic Details
Main Authors: Sun, Liqiang, Meng, Lingxiao, Guo, Wei, Feng, Xiaowei, Nie, Wen, Chu, Jian, Hou, Jinfang
Other Authors: School of Civil and Environmental Engineering
Format: Journal Article
Language:English
Published: 2018
Subjects:
Online Access:https://hdl.handle.net/10356/89190
http://hdl.handle.net/10220/46127