PENENTUAN JUMLAH KEBUTUHAN TENAGA KERJA BERDASARKAN WAKTU BAKU PADA PROSES PENGOLAHAN ABON SAPI (Di Industri Rumah Tangga Pengolahan Makanan Merk �Bu Rejo�)

Problems often faced by the domestic industry is the duty cycle and the production process is not productive. This is due to related industry does not understand the equivalence between the amount of labor required by the product. One of these is to improve performance by performing calculations bas...

Full description

Bibliographic Details
Main Authors: , RENI SUHERNI, , Dr. Nafis Khuriyati, STP, M.Agr
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Description
Summary:Problems often faced by the domestic industry is the duty cycle and the production process is not productive. This is due to related industry does not understand the equivalence between the amount of labor required by the product. One of these is to improve performance by performing calculations based on the amount of labor time studies. At the time of this study, carried out observations of the cycle time of a worker at the time of doing the job. The cycle time of the data, performed calculations to determine the standard time and the amount of labor required at a work station. Case studies conducted in Household Food Processing Industry Brand \"Bu Rejo\". This study focused on shredded beef products. Analysis used for the calculation of standard time using the cycle time of each work station. Based on the results of the calculation of the amount of labor required theoretically as many as 5 people, while there are 4 people on the ground. So far the number of owned labor, the production process continues to run smoothly because of cross-process activities not collide with each other so that the worker can fill the void of time in a way to help other workers who have not been completed.