QUALITY CONTROL DAN METODE KERJA INTEGRAL BRIDGE SECTION P53-P87 PROYEK PEMBANGUNAN JALAN TOL SURABAYA - MOJOKERTO SEKSI IB
Integral bridge system consists of full integral and semi integral. Integral bridges with spans of less than 20 meters using the most optimum type of reinforced concrete with integral full system, while if more than 20 meters is preferred to use the type of prestressed with semi integral system. Int...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: |