Prediksi aliran permukaan menggunakan modifikasi model bilangan kurva =prediction of surface runoff using modification of curve number model
ABSTRACT The objectives of the study are (i) to predict surface runoff of watersheds using modification of curve number model, and (ii) to find out the good fit of model application at different size of watersheds. The research was conducted in Padas sub watershed (3356.48 ha)- and Goseng sub waters...
Main Author: | |
---|---|
Format: | Article |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2005
|
Subjects: |