PENGUJIAN EFISIENSI TURBIN CROSS FLOW DENGAN VARIASI JUMLAH SUDU PADA PEMBANGKIT TENAGA MIKROHIDRO MODEL DRUM (PTMMD)

Potential water resources in Indonesia are still not optimally utilized, especially for the generation of electrical energy. Scale hydropower potential of micro hydropower in Indonesia spread almost reached 500 MW, while it only reached 4.5% utilization of the existing potential. Blueprint National...

Full description

Bibliographic Details
Main Authors: , PURWANTO, ST, , Dr. Suyitno, ST., M.Sc.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2011
Subjects:
ETD