Low Gain Avalanche Detector development for the LHC’s High-Luminosity Upgrade at Teledyne e2v
The need for ultra-fast timing is a result of the expected pile-up at the High-Luminosity LHC General-Purpose Detectors. Track timing resolution of the order of tens of picoseconds is required to sufficiently resolve individual vertices. In collaboration with Teledyne e2v, 22 six-inch wafers with Lo...
Main Authors: | , , , , , , , , , , , |
---|---|
Format: | Journal article |
Language: | English |
Published: |
Elsevier
2022
|