Extension of test time in Ludwieg tunnels
<p>Two new, longer duration, modes of operation for Ludwieg Tunnels have been implemented in the Oxford High Density Tunnel (HDT): Extended Ludwieg Mode (ELM) and Plenum Augmented Ludwieg Mode (PALM). In standard Ludwieg Tunnel operation, the duration of the steady test time is limited by the...
Main Authors: | , , , |
---|---|
Format: | Conference item |
Language: | English |
Published: |
European Space Agency
2022
|