The development of intra-train beam stabilisation system prototypes for a future linear collider
<p>Any future linear collider requires a beam stabilisation system at the interaction point to the to maintain luminosities. This thesis details the development of prototypes of three such systems based at the Accelerator Test Facility 2 (ATF2) at KEK, Japan.</p> <p>The upstream fe...
Auteur principal: | Davis, MR |
---|---|
Autres auteurs: | Burrows, P |
Format: | Thèse |
Langue: | English |
Publié: |
2014
|
Sujets: |
Documents similaires
-
The development of a fast intra-train beam-based feedback system capable of operating on the bunch trains of the International Linear Collider
par: Bett, D
Publié: (2013) -
An intra-pulse fast feedback system for a future linear collider
par: Jolly, S
Publié: (2003) -
CLIC drive beam phase stabilisation
par: Gerbershagen, A
Publié: (2013) -
Instrumentation for colliding beam physics /
par: International Conference on Instumentation for Colliding Beam Physics n(5th : 1990 : Novosibirsk, USSR), et autres
Publié: (1990) -
A study of interferometric distance measurement systems on a prototype rapid tunnel reference surveyor and the effects of reference network errors at the International Linear Collider
par: Dale, J, et autres
Publié: (2009)