Neidio i'r cynnwys
VuFind
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
    • Հայերէն
    • Українська
    • Sámegiella
    • Монгол
Uwch
  • Alignment of the CMS silicon t...
  • Dyfynnu hwn
  • Anfonwch hwn fel neges destun
  • E-bostio hwn
  • Argraffu
  • Allforio Cofnod
    • Allforio i RefWorks
    • Allforio i EndNoteWeb
    • Allforio i EndNote
  • Permanent link
Alignment of the CMS silicon tracker during commissioning with cosmic rays

Alignment of the CMS silicon tracker during commissioning with cosmic rays

Show other versions (1)
Manylion Llyfryddiaeth
Prif Awduron: Chatrchyan, S, Khachatryan, V, Sirunyan, A, Adam, W, Arnold, B, Bergauer, H, Bergauer, T, Dragicevic, M, Eichberger, M, Eroe, J, Friedl, M, Fruehwirth, R, Ghete, V, Hammer, J, Haensel, S, Hoch, M, Hoermann, N, Hrubec, J, Jeitler, M, Kasieczka, G, Kastner, K, Krammer, M, Liko, D, de Abril, I, Mikulec, I
Fformat: Journal article
Cyhoeddwyd: 2010
  • Daliadau
  • Disgrifiad
  • Other Versions (1)
  • Eitemau Tebyg
  • Dangos Staff
Dangos 1 - 1 canlyniadau o 1
Show all versions (2)
Search Result 1
Alignment of the CMS silicon tracker during commissioning with cosmic rays

Alignment of the CMS silicon tracker during commissioning with cosmic rays gan Chatrchyan, S, Khachatryan, V, Sirunyan, A, Adam, W, Arnold, B, Bergauer, H, Bergauer, T, Dragicevic, M, Eichberger, M, Erö, J, Friedl, M, Frühwirth, R, Ghete, V, Hammer, J, Hansel, S, Hoch, M, Hörmann, N, Hrubec, J, Jeitler, M, Kasieczka, G, Kastner, K, Krammer, M, Liko, D, De Magrans Abril, I, Mikulec, I

Cyhoeddwyd 2010
Journal article
Show all versions (2)

Eitemau Tebyg

  • Commissioning and Performance of the CMS Pixel Tracker with Cosmic Ray Muons
    gan: Chatrchyan, S, et al.
    Cyhoeddwyd: (2010)
  • Commissioning and performance of the CMS silicon strip tracker with cosmic ray muons
    gan: Chatrchyan, S, et al.
    Cyhoeddwyd: (2010)
  • Performance and operation of the CMS electromagnetic calorimeter
    gan: Chatrchyan, S, et al.
    Cyhoeddwyd: (2010)
  • Alignment of the CMS silicon tracker during commissioning with cosmic rays
    gan: Chatrchyan, S, et al.
    Cyhoeddwyd: (2010)
  • Time reconstruction and performance of the CMS electromagnetic calorimeter
    gan: Chatrchyan, S, et al.
    Cyhoeddwyd: (2010)

Opsiynau Chwilio

  • Hanes Chwilio
  • Chwiliad Uwch

Canfod Mwy

  • Pori'r Catalog
  • Pori yn ôl y Wyddor
  • Archwiliwch Sianeli
  • Cronfeydd y Cwrs
  • Eitemau Newydd

Angen Help?

  • Awgrymiadau Chwilio
  • Gofynnwch i Lyfrgellydd
  • Cwestiynau Cyffredin