Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
We report the results of a low-latency beam phase feed-forward system built to stabilise the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilised to approximately 50~fs. The...
Main Authors: | , , , , , , , |
---|---|
Format: | Journal article |
Published: |
American Physical Society
2018
|