Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
We report the results of a low-latency beam phase feed-forward system built to stabilise the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilised to approximately 50~fs. The...
Main Authors: | , , , , , , , |
---|---|
Format: | Journal article |
Published: |
American Physical Society
2018
|
_version_ | 1826303489177812992 |
---|---|
author | Roberts, J Skowronski, P Burrows, P Christian, G Corsini, R Ghigo, A Marcellini, F Perry, C |
author_facet | Roberts, J Skowronski, P Burrows, P Christian, G Corsini, R Ghigo, A Marcellini, F Perry, C |
author_sort | Roberts, J |
collection | OXFORD |
description | We report the results of a low-latency beam phase feed-forward system built to stabilise the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilised to approximately 50~fs. The system latency was \(350\)~ns and the correction bandwidth \(>23\)~MHz. The system meets the requirements for CLIC. |
first_indexed | 2024-03-07T06:03:28Z |
format | Journal article |
id | oxford-uuid:ed060764-56f2-4c8e-b21e-d22b8755536d |
institution | University of Oxford |
last_indexed | 2024-03-07T06:03:28Z |
publishDate | 2018 |
publisher | American Physical Society |
record_format | dspace |
spelling | oxford-uuid:ed060764-56f2-4c8e-b21e-d22b8755536d2022-03-27T11:21:50ZStabilization of the arrival time of a relativistic electron beam to the 50 fs levelJournal articlehttp://purl.org/coar/resource_type/c_dcae04bcuuid:ed060764-56f2-4c8e-b21e-d22b8755536dSymplectic Elements at OxfordAmerican Physical Society2018Roberts, JSkowronski, PBurrows, PChristian, GCorsini, RGhigo, AMarcellini, FPerry, CWe report the results of a low-latency beam phase feed-forward system built to stabilise the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilised to approximately 50~fs. The system latency was \(350\)~ns and the correction bandwidth \(>23\)~MHz. The system meets the requirements for CLIC. |
spellingShingle | Roberts, J Skowronski, P Burrows, P Christian, G Corsini, R Ghigo, A Marcellini, F Perry, C Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title | Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_full | Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_fullStr | Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_full_unstemmed | Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_short | Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_sort | stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
work_keys_str_mv | AT robertsj stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT skowronskip stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT burrowsp stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT christiang stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT corsinir stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT ghigoa stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT marcellinif stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT perryc stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel |