High-rate fermentative hydrogen production from palm oil mill effluent in an up-flow anaerobic sludge blanket-fixed film reactor
The major problem associated with UASB reactors for biotransformation of organic matter to hydrogen is the long start-up period (2–4 months) required for the growth of the microbial granules. In this study, an integration of granular sludge system and a fixed film reactor in a single reactor was app...
Main Authors: | , , |
---|---|
Format: | Article |
Published: |
Institution of Chemical Engineers
2014
|
Subjects: |