Developing a risk-based inspection practices maturity model for Malaysian industries
A framework was formulated based on the model of MIRM (2008) to measure the risk-based inspection (RBI) practices maturity level in the Malaysian RBI scheme users. The RBI Practices Maturity Model will assess the level of compliance and effectiveness with a recently introduced regulatory instrument...
Váldodahkkit: | , , |
---|---|
Materiálatiipa: | Artihkal |
Almmustuhtton: |
Elsevier
2018
|
Fáttát: |