Building construction labour productivity in arid climate environment

Productivity is a significant aspect of construction industry that plays vital role for success and failure of any construction project. This industry generates 11% to 13% of GDP all around the globe and the cost of labour in any building project is 20% to 35% of the cost of Building. On daily basis...

Descripción completa

Detalles Bibliográficos
Autores principales: Bhatti, Imtiaz Ali, Abdullah, Abd Halid, Nagapan, Sasitharan, BHATTI, Nabi Bux, Lakhiar, Muhammad Tahir, MAHAR, Muntazir Mahdi
Formato: Artículo
Lenguaje:English
Publicado: Sciendo 2019
Materias:
Acceso en línea:http://eprints.uthm.edu.my/4962/1/AJ%202020%20%2842%29.pdf
_version_ 1825709939434192896
author Bhatti, Imtiaz Ali
Abdullah, Abd Halid
Nagapan, Sasitharan
BHATTI, Nabi Bux
Lakhiar, Muhammad Tahir
MAHAR, Muntazir Mahdi
author_facet Bhatti, Imtiaz Ali
Abdullah, Abd Halid
Nagapan, Sasitharan
BHATTI, Nabi Bux
Lakhiar, Muhammad Tahir
MAHAR, Muntazir Mahdi
author_sort Bhatti, Imtiaz Ali
collection UTHM
description Productivity is a significant aspect of construction industry that plays vital role for success and failure of any construction project. This industry generates 11% to 13% of GDP all around the globe and the cost of labour in any building project is 20% to 35% of the cost of Building. On daily basis labour utilizes 30% of time on productive activities rest 70% of the time is ruined in non-productive activities, there are multi factors which are affecting the labour production in construction industry hence this study provides an overview of productivity, Total Factor productivity, method used to measure accurate productivity in construction projects. The objective of this study is find out percentage up to what extent labour production is affected due to weather conditions, however this study is carried out in arid climate region in Month of June 2018, where minimum temperature was recorded 26.0 Celsius degree at 7:30 AM and Maximum was 47.80 Celsius degree at 3:00 PM. A descriptive survey research design approach was adopted using continuous observation method of study. Project work study manual served as the research instrument to collect the data on selected building sites for 30 working days. Data collected were analyzed using descriptive statics. The results show that average monthly production of mason gang was recorded with less production of 28.759%, Carpentry gang with average monthly loss of production 16.74% & steel fixer gang had average monthly loss of production was 12.188. This concludes that prior to signing the contract for construction project. The location, environment, topography of region, capacity of construction operatives must be kept in mind to decide the proper timeline for the successful of project.
first_indexed 2024-03-05T21:50:01Z
format Article
id uthm.eprints-4962
institution Universiti Tun Hussein Onn Malaysia
language English
last_indexed 2024-03-05T21:50:01Z
publishDate 2019
publisher Sciendo
record_format dspace
spelling uthm.eprints-49622022-01-03T01:48:22Z http://eprints.uthm.edu.my/4962/ Building construction labour productivity in arid climate environment Bhatti, Imtiaz Ali Abdullah, Abd Halid Nagapan, Sasitharan BHATTI, Nabi Bux Lakhiar, Muhammad Tahir MAHAR, Muntazir Mahdi T Technology (General) TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Productivity is a significant aspect of construction industry that plays vital role for success and failure of any construction project. This industry generates 11% to 13% of GDP all around the globe and the cost of labour in any building project is 20% to 35% of the cost of Building. On daily basis labour utilizes 30% of time on productive activities rest 70% of the time is ruined in non-productive activities, there are multi factors which are affecting the labour production in construction industry hence this study provides an overview of productivity, Total Factor productivity, method used to measure accurate productivity in construction projects. The objective of this study is find out percentage up to what extent labour production is affected due to weather conditions, however this study is carried out in arid climate region in Month of June 2018, where minimum temperature was recorded 26.0 Celsius degree at 7:30 AM and Maximum was 47.80 Celsius degree at 3:00 PM. A descriptive survey research design approach was adopted using continuous observation method of study. Project work study manual served as the research instrument to collect the data on selected building sites for 30 working days. Data collected were analyzed using descriptive statics. The results show that average monthly production of mason gang was recorded with less production of 28.759%, Carpentry gang with average monthly loss of production 16.74% & steel fixer gang had average monthly loss of production was 12.188. This concludes that prior to signing the contract for construction project. The location, environment, topography of region, capacity of construction operatives must be kept in mind to decide the proper timeline for the successful of project. Sciendo 2019 Article PeerReviewed text en http://eprints.uthm.edu.my/4962/1/AJ%202020%20%2842%29.pdf Bhatti, Imtiaz Ali and Abdullah, Abd Halid and Nagapan, Sasitharan and BHATTI, Nabi Bux and Lakhiar, Muhammad Tahir and MAHAR, Muntazir Mahdi (2019) Building construction labour productivity in arid climate environment. Journal of Applied Engineering Sciences, 9 (22). pp. 125-130. ISSN 2247-3769 https://dx.doi.org/ 10.2478/jaes-2019-0017
spellingShingle T Technology (General)
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Bhatti, Imtiaz Ali
Abdullah, Abd Halid
Nagapan, Sasitharan
BHATTI, Nabi Bux
Lakhiar, Muhammad Tahir
MAHAR, Muntazir Mahdi
Building construction labour productivity in arid climate environment
title Building construction labour productivity in arid climate environment
title_full Building construction labour productivity in arid climate environment
title_fullStr Building construction labour productivity in arid climate environment
title_full_unstemmed Building construction labour productivity in arid climate environment
title_short Building construction labour productivity in arid climate environment
title_sort building construction labour productivity in arid climate environment
topic T Technology (General)
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
url http://eprints.uthm.edu.my/4962/1/AJ%202020%20%2842%29.pdf
work_keys_str_mv AT bhattiimtiazali buildingconstructionlabourproductivityinaridclimateenvironment
AT abdullahabdhalid buildingconstructionlabourproductivityinaridclimateenvironment
AT nagapansasitharan buildingconstructionlabourproductivityinaridclimateenvironment
AT bhattinabibux buildingconstructionlabourproductivityinaridclimateenvironment
AT lakhiarmuhammadtahir buildingconstructionlabourproductivityinaridclimateenvironment
AT maharmuntazirmahdi buildingconstructionlabourproductivityinaridclimateenvironment