Enhancement of scheduling system interfactes and punctionalities case study : Asian Institute of Medical, Science and Technology (AIMST) scheduling system
The purpose of the AIMST project is to produce a scheduling system for AIMST that allows the user to setup scheduling time for selected control unit and monitoring the control unit based on the scheduling time given. The issue that arises is that the AIMST system was developed based on the requireme...
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/35917/1/NordahliaBintiAbdulJalalMFC2008.pdf |