Skip to content
VuFind
English
Deutsch
Español
Français
Italiano
日本語
Nederlands
Português
Português (Brasil)
中文(简体)
中文(繁體)
Türkçe
עברית
Gaeilge
Cymraeg
Ελληνικά
Català
Euskara
Русский
Čeština
Suomi
Svenska
polski
Dansk
slovenščina
اللغة العربية
বাংলা
Galego
Tiếng Việt
Hrvatski
हिंदी
Հայերէն
Українська
Sámegiella
Монгол
Language
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Tag
Find
Advanced
Just-in-time management of pre...
Cite this
Text this
Email this
Print
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Permanent link
Just-in-time management of precast concrete building construction
Bibliographic Details
Main Author:
Lee , Chin Heng
Format:
Thesis
Published:
2004
Subjects:
TH Building construction
Holdings
Description
Similar Items
Staff View
Similar Items
Just-in-time management of precast concrete building construction /
by: 369751 Lee, Chin Heng
Published: (2004)
Just-in-time management of precast concrete building construction [compact disc] /
by: 369751 Lee, Chin Heng
Published: (2004)
The structural behaviour of precast lightweight foamed concrete sandwich panel as a load bearing wall
by: Mohamad, Noridah
Published: (2010)
The Application Of The Just-in-time Philosophy In The Chinese Construction Industry
by: Low , Sui Pheng, et al.
Published: (2011)
Time management in construction
by: Balakrishna, Saravanan, et al.
Published: (2013)