Integration of economic production quantity with defective items for multi-product in multi-period
Manufacturers often face material losses during the process of any specific production assemblies which are usually unpredictable. However, the attrition percentage can normally be obtained. In order to make sure that the demand is met despite attrition, the production needs to be planned wisely. In...
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/81004/1/GeethampariSubramaniamMFS2017.pdf |